Tenants needing to remove additions and handle surfaces according to a handover list before moving out of a residence.
Handover Restoration
Confirming the scope of dismantling, repairs, and cleaning according to property handover requirements specified by tenancy, landlord, or management.
Want a clear written quote?
Share your items, addresses and moving conditions, or send photos on WhatsApp first. We will follow up on anything else needed.

When is Handover Restoration right for you?
Handover restoration starts from the lease, landlord, or management's acceptance list, cross-referencing removal, transport, surface repairs, and handover items one by one. It differs from pure dismantling: dismantling is just one step; final acceptance must be based on pre-confirmed restoration standards.
Offices or shops nearing lease end requiring coordination of dismantling, removal, and specified repairs.
Premises where the landlord has provided photos of original conditions or written restoration requirements.
Handover Restoration process
Compare requirements
Organise lease agreements, original condition records, and management acceptance items.
List responsibilities
Separate tasks for removal, dismantling, repairs, and work requiring other contractors.
Execute in order
Remove items first, then complete surface restoration items included in writing.
Pre-inspection handover
Check with photos against the list, allowing the client to arrange acceptance by the landlord or management.
What's included?
Included in your quote
- Organise executable restoration items based on provided documents.
- Remove movable items and general dismantled materials listed in the quotation.
- Complete basic non-professional surface treatments included in writing.
- Assist the client in pre-handover verification using the list and completion photos.
Requires separate confirmation
- MEP, plumbing, fire services, AC, or other restoration requiring professional qualifications.
- Structural work, licence applications, testing certificates, or management deposits.
- Repair requirements added after landlord inspection not originally listed.
What affects your quote?
Acceptance standards
Lease wording, original condition records, and the landlord's list determine completion boundaries.
Restoration items
Just removing installations versus needing to fill holes and treat surfaces are different work scopes.
Site scale
Number of rooms, surface area, and areas requiring coordination affect procedures.
Contractor coordination
If other professional works exist, sequencing and access times must be coordinated together.
Checklist
Prepare these details or photos before requesting a quote
- 1Provide relevant lease terms, handover notices, and the landlord's list.
- 2Submit photos of original conditions upon moving in, drawings, and records of added items.
- 3Confirm items to be kept, removed, repaired, or outsourced item-by-item.
- 4Enquire about management office construction applications, protection, and acceptance procedures.
- 5Reserve time for landlord pre-inspection to avoid confirming standards on the final day.
Frequently asked questions
Does restoration guarantee the landlord will accept the premises?
Cannot guarantee third-party acceptance results; the service is executed according to pre-obtained written standards; new requirements must be defined again.
What is the difference between doing just dismantling and performing restoration?
Dismantling focuses on removing specified installations; restoration must also cross-reference handover status, repair liabilities, and handover lists.
Can you handle electrical or fire service restoration on our behalf?
These works must be assessed by appropriate professionals according to site and regulations; they are not part of our general restoration commitment.
Compare specific dismantling services
If you only need to dismantle non-structural installations rather than full handover restoration, you can first understand the work boundaries of dismantling.
