Office Relocation

Organizing commercial moves by department, equipment, and files, scheduled to minimize operational disruption.

Want a clear written quote?

Share your items, addresses and moving conditions, or send photos on WhatsApp first. We will follow up on anything else needed.

搬運團隊在香港商業空間分類設備及紙箱
Is this service right for you?

When is Office Relocation right for you?

Office relocation involves more than just desks and chairs; it must also account for employee seating, computer peripherals, and file relocation. We arrange the sequence based on department labeling, the new office seating plan, and building regulations. Actual resumption of work is determined by the company in coordination with its IT and property management teams.

01

Offices requiring computers, monitors, and personal items to be moved according to seat numbers.

02

Teams with large volumes of contracts, archive boxes, or departmental documents requiring categorized handover.

03

Companies preparing to move to a different floor within the same building or relocating to another commercial building.

Service process

Office Relocation process

01

Inventorying seating

Recording the number of workstations, document boxes, office furniture, and movable IT equipment.

02

Organizing labels

Creating color-coded or numbered labels based on department, seat number, and new location zones.

03

Sequential moving

Coordinating with freight elevator slots, securing, loading, and delivering to the new site according to confirmed batches.

04

Designated area handover

Placing items at locations specified in the seating plan, to be verified zone-by-zone by a company representative.

Scope of service

What's included?

Included in your quote

  • Moving standard office desks, chairs, mobile pedestals, and sealed document boxes.
  • Basic protection for computers, monitors, and standard peripherals that have already been powered down and disconnected.
  • Placing items at designated points in the new office according to provided department or seating labels.
  • Dismantling/reassembly of standard furniture as specified in the quotation list.

Requires separate confirmation

  • Dismantling, connection, and testing of servers, networking, and telephone systems.
  • Destruction of confidential documents, secure transport, or data erasure.
  • Reinstatement, disposal, storage, or dismantling/reassembly beyond the quoted list.
What affects your quote?

What affects your quote?

Workstation scale

The total volume of workstations, cartons, monitors, and office equipment affects the number of trips and work procedures.

Document categorization

The volume of files, packing status, and specified handover methods affect processing time.

Constraints at both locations

Freight elevator bookings, loading/unloading locations, access route distances, and property management requirements must all be accounted for.

Dismantling/reassembly items

Desk units, meeting tables, partitions, or built-in cabinets require separate assessment based on dimensions.

Checklist

Prepare these details or photos before requesting a quote

  1. 1Submit seating plans, and lists of furniture and IT equipment.
  2. 2IT personnel to arrange shutdown, backup, disconnection, and cable labeling.
  3. 3Pack boxes and label them according to department and new seat numbers.
  4. 4Book freight elevators at both the old and new buildings and confirm work permits.
  5. 5Appoint handover representatives for both locations and secure confidential documents.

Data and equipment must be handled by designated personnel first.

Servers and network equipment should be powered down, backed up, and dismantled/reconnected by a qualified IT team; sensitive documents should also be sealed and handed over by company-appointed personnel.

Frequently asked questions

Frequently asked questions

Will the moving team disconnect the computer cables?

Standard computers must be powered down and disconnected by the client's IT personnel first; we are responsible for the protection and transport of items listed as safe to move.

How can we avoid misdelivering documents to the wrong seat?

We suggest labeling each box with the department, old seat, and new seat number, and having a company representative verify the items against the seating plan at the new location.

Can you guarantee that all operations will resume by the next morning?

We can arrange the move based on a priority list, but system reconnection, property management arrangements, and internal verification all affect the resumption of work; we do not provide downtime guarantees.

View moving price guide

Learn how packages, furniture, dismantling and common extras are priced.

View guide