Public Housing Moving

We are familiar with public housing estate lift access, loading/unloading zones, and management protocols, planning the moving sequence based on the volume of items in your unit.

Want a clear written quote?

Share your items, addresses and moving conditions, or send photos on WhatsApp first. We will follow up on anything else needed.

搬運團隊在香港住宅內搬運已包裹的梳化
Is this service right for you?

When is Public Housing Moving right for you?

Public housing relocations often involve estate entrance registration, lift usage, and the handover of the vacated unit or coordination for moving in after renovation. We will verify routes and time slots based on the actual arrangements of individual estates; we do not assume that all estates follow the same procedures.

01

Transferring between public housing units or moving into public housing from another residence

02

Families who need to coordinate with the renovation completion and key handover dates of the new unit

03

Residents who need to coordinate clearance and the unit handover time before moving out

Service process

Public Housing Moving process

01

Confirming the relocation schedule

Organising the sequence of key handover, renovation completion, moving in, and old unit handover.

02

Checking estate access

Clients must confirm registration, lift, and vehicle arrangements with the relevant estate office.

03

Zonal moving

Packing and labelling items according to family requirements, and transporting them via confirmed routes.

04

On-site check-in

Positioning items by area in the new unit, counting cartons, and keeping items needed before handover.

Scope of service

What's included?

Included in your quote

  • Moving general household items according to the declared inventory
  • Basic protection for large furniture and appliances
  • Dismantling and reassembly of furniture as listed in the quotation
  • Positioning according to room labels in the new unit

Requires separate confirmation

  • Clearing the old unit, waste disposal, and removing fixtures
  • Renovation snagging, wall repairs, or other reinstatement works
  • Additional tasks due to long walking distances, stairs, or extra stops
What affects your quote?

What affects your quote?

Estate access routes

Gates, building entrances, lifts, and corridors will affect transport routes.

Loading/unloading areas

The actual distance from accessible parking spots to the lobby must be assessed based on site information.

Handover sequence

Renovation completion, key collection, and old unit handover dates will determine the moving schedule.

Clearance scope

Items to be moved and items to be disposed of or handled must be listed separately.

Checklist

Prepare these details or photos before requesting a quote

  1. 1Checking with the estate office regarding same-day registration and lift usage arrangements
  2. 2Photographing building entrances, lift interiors, corridors, and loading/unloading routes
  3. 3Confirming when renovation protection in the new unit will be removed and when the unit is accessible
  4. 4Colour-coding items to be moved, items to be kept until handover, and items for disposal
  5. 5Keeping documents, keys, and handover inspection supplies with you

Clearly distinguish between handover and moving scopes

Standards for unit handover should adhere to requirements provided by the relevant authorities; moving, clearance, and reinstatement are different types of work and should be confirmed separately.

Frequently asked questions

Frequently asked questions

Is it mandatory to book lifts in public housing estates?

Arrangements may vary by estate; you should check directly with the relevant estate office. We will schedule based on the confirmation you obtain.

Can you also dispose of old furniture after the move?

You can provide a list, but clearance and disposal will be assessed separately from the move and must be handled using appropriate methods.

Can I move in if the new unit still has renovation work?

You must confirm that the unit is safe to enter, routes are clear, and delivery arrangements are in place to avoid obstruction between moving and renovation work.

View moving price guide

Learn how packages, furniture, dismantling and common extras are priced.

View guide