Factory Relocation

Understanding machinery, workbenches, raw materials, and floor load limits before defining the scope of a factory relocation.

Want a clear written quote?

Share your items, addresses and moving conditions, or send photos on WhatsApp first. We will follow up on anything else needed.

搬運團隊為直立式鋼琴加上保護物料及搬運工具
Is this service right for you?

When is Factory Relocation right for you?

Factory relocation involves machine weight, floor load capacity, energy isolation, and recalibration, posing risks far greater than general moving. We only handle general materials confirmed as safe to move or work in coordination with a designated professional team; mechanical external lifting/hoisting, electrical, gas, and production line engineering are definitely not included.

01

Factories needing to move office supplies, spare parts, or independent equipment already handled by experts.

02

Enterprises already having mechanical, electrical, and external lifting/hoisting contractors, and needing to coordinate general transport.

03

Production units preparing to clear and transfer non-hazardous materials in batches based on shut-down areas.

Service process

Factory Relocation process

01

Define responsibilities

Clearly distinguish the responsible parties for general moving, mechanical engineering, utility systems, and regulated materials.

02

Professional confirmation

Weight, lifting points, isolation status, and transport requirements to be provided by client-designated experts.

03

Site coordination

Handle qualified items only after shutdown, power-off, draining, and route approval are completed.

04

Document handover

Deliver to designated locations according to the list, to be taken over by the equipment provider for installation, calibration, and startup.

Scope of service

What's included?

Included in your quote

  • Moving of standard toolboxes, spare parts, and non-regulated materials listed.
  • Transport coordination for standard independent items certified as movable by professionals.
  • Loading/unloading according to designated engineering windows and safe routes.
  • Securing general cargo in the vehicle and recording handover at the destination.

Requires separate confirmation

  • Mechanical dismantling, external lifting/hoisting, jacking, positioning, grouting, or leveling.
  • Electrical, gas, compressed air, exhaust, or piping isolation and connection.
  • Handling of dangerous goods, license applications, structural assessment, and professional engineering insurance.
What affects your quote?

What affects your quote?

Equipment data

Accurate weight, center of gravity, dimensions, lifting points, and manufacturer moving guidelines are all mandatory.

Energy status

Certificates of power-off, draining, pressure release, and decontamination determine whether items can be accepted.

Engineering interface

Responsibilities and time slots for mechanical contractors, electricians, external lifting/hoisting providers, and transport parties must be clearly coordinated.

Factory routes

Floor load capacity, doorways, ramps, ceiling height, and vehicle turning space will limit options.

Checklist

Prepare these details or photos before requesting a quote

  1. 1Submit equipment nameplates, drawings, weight, center of gravity, and transport manuals.
  2. 2Hire qualified experts to develop plans for shutdown, isolation, draining, and restarting.
  3. 3Declare oils, chemicals, gas cylinders, and other regulated materials.
  4. 4Verify floor load capacity, utility systems, and installation space at the new site.
  5. 5Document responsibilities for each contractor, handover points, and safety supervisors in writing.

Machinery and utility systems must be handled by experts

Equipment without completed lockout/tagout, pressure release, draining, or decontamination will not be moved; external lifting/hoisting, electrical, and piping work must be left to contractors with appropriate qualifications.

Frequently asked questions

Frequently asked questions

Can you dismantle production machinery directly?

Generally not included. Mechanical dismantling must be assessed and executed by the equipment manufacturer or a qualified professional contractor; we only provide transport services based on written confirmation.

Can you guarantee immediate production after moving the machinery?

No. Installation, calibration, testing, licensing, and restarting are confirmed by relevant experts and the factory; moving services do not guarantee production resumption time.

Can you quote before having weight information?

We can discuss the scope first, but formal plans involving equipment must have reliable weight and handling data; we do not commit to work based on estimates.

View moving price guide

Learn how packages, furniture, dismantling and common extras are priced.

View guide